This book consist : Introduction; Management system for maintenance, periodic testing and inspection; Overview of maintenance, periodic testing and inspection; Deisgn considerations; Programme for maintenace periodic testing and inspection; Organization and responsibilities for maintenance periodic testing and inspection; Selection, training and qualification of personnel; Procedures; Administr…
This book consist : Characteristics of nuclear reactors used for the production of molybdenum-99; Targets for the production of neutron activated molybdenum-99; Converting targets and processes for fission-product molybdenum-99 from high-to low-enriched uranium; The accelerator production of molybdenum-99; Accelerator production of 99mTc with proton beams and enriched 100Mo targets; Excitation …
-
-
This book consist : Introduction; Safety asessment, safety analysis and independent verification; Engineering aspects important to safety; Safety analysis; and Independent verification. (Jml)
A new format has been adopted for the Nuclear Safety Review 1995 to present the major safety developments of the past year. The focus on the report has been shifted to feature a number of prominent relevant issues and to concentrate on their implications for radiation and nuclear safety. The Review includes in-depth discussions of steam generator integrity, control rod drive nozzle cracking, fi…
This book consist : General provisions; Organization; Planning of the manufacturing process; Document control; Procurement control; Identification and control of materials, parts and components; Inspection and test control; Calibration and control of measuring and test equipment; Manufacturing equipment control; Handling, storage and shipping; Non-conformance control; Corrective action; Quality…
-
This book consist : Introduction; Organization and responsibilities; Safety assessment, categorization and approval routes; General and specific safety requirements for design; Pre-implementation phase of a utilization or modification project; Implementation phase of a utilization or modification project; Post implementation phase of a utilization or modification project; Operational safety req…
-