This report contains the finding of the "NUREG-1150 Peer Review Panel" on the methodology and results presented in the Draft Reactor Risk Reference Study (NUREG-1150) and supporting documentation. The report consists of two principal parts: the chairman's report, which summarizes the principal issues of the review, and the individual member's reports, which supply the individual findings and te…
This book consist : Introduction; Safety asessment, safety analysis and independent verification; Engineering aspects important to safety; Safety analysis; and Independent verification. (Jml)
Buku Kajian Tentang Perekonomian Indonesia ini sudah yang keempat kalinya, diawali dengan : Menatap ke Depan Perekonomian Nasional (1999), kemudian disusul oleh Perekonomian Indonesia Tahun 2001: Prospek dan Kebijakan dan Perekonomian Indonesia Tahun 2002: Prospek dan Kebijakan. Studi-studi tersebut mewarnai penyusunan Program Pembangunan Nasional (Propenas 2000 – 2004) dan APBN TA 2000. (JmL)
A new format has been adopted for the Nuclear Safety Review 1995 to present the major safety developments of the past year. The focus on the report has been shifted to feature a number of prominent relevant issues and to concentrate on their implications for radiation and nuclear safety. The Review includes in-depth discussions of steam generator integrity, control rod drive nozzle cracking, fi…
This book consist : General provisions; Organization; Planning of the manufacturing process; Document control; Procurement control; Identification and control of materials, parts and components; Inspection and test control; Calibration and control of measuring and test equipment; Manufacturing equipment control; Handling, storage and shipping; Non-conformance control; Corrective action; Quality…
-
This book consist : Introduction; Organization and responsibilities; Safety assessment, categorization and approval routes; General and specific safety requirements for design; Pre-implementation phase of a utilization or modification project; Implementation phase of a utilization or modification project; Post implementation phase of a utilization or modification project; Operational safety req…
-
-
-