This book consist : Introduction; Origin and characteristics of chemically toxic LILW; Regulatory approaches for waste management; Pre-disposal management of LILW containing chmically toxic components; Waste disposal; Safety assessment; and Concluding remarks. (Jml)
This book consist : Introduction; Management system for commissioning; Commissioning programme; Commissioning organization; Commissioning stages; Commissioning procedures and reports; Documentation; and Commissioning of new experimental devices and modifications. (Jml)
-
Essay about The nuclear power industry at the turn of the 21st century; The thermal process in wet-steam turbines; and Design; Operation; Refurbishment; including Appendix , list of abbreviations and symbols.
Buku ini berisi Laporan Keselamatan Nuklir di Indonesia Tahun 2004 seri No. 06. Rev. 0.0. Laporan ini memuat kondisi keselamatan nuklir tahun 2004 di bidang kesehatan, industri dan penelitian dan lingkungan BATAN semakin membaik. Beberapa kecelakaan radiasi dilaporkan dan tercatat disebabkan oleh faktor-faktor pelanggaran prosedur, kesalahan operasional dan kegagalan peralatan. (Jml)
-
Buku ini berisi Laporan Keselamatan Nuklir di Indonesia Tahun 2002 seri No. 04 Rev. 0.0. Laporan ini menyajikan secara penuh kondisi keselamatan nuklir di Indonesia selama kegiatan ketenaganukliran di Indonesia tahun 2002. (Jml)
Buku ini berisi Laporan Keselamatan Nuklir di Indonesia Tahun 1999 No. 01. Rev 0.0 yang menyajikan secara penuh kondisi keselamatan nuklir di Indonesia selama 40 tahun kegiatan ketenaganukliran di Indonesia, yaitu dimulai dengan dibentuknya Lembaga Tenaga Atom Desember 1958 sampai dengan tahun 1999. (jml)
This book consist : Introduction; Research and development programmes for heavy water reactors; and Power plant technologies and design. (Jml)
This book consist : Chapter 1. Introduction; Chapter 2. Facility description; Chapter 3. Experiment description and results of the test; Chapter 4. Analytical models; Chapter 5. Comparison of measured and calculated parameters; Chapter 6. Pretest calculations presented at the workshop and post-test analysis; and Chapter 7. Conclusions. (Jml)