Book
Final Safety Evaluation Report Related to the Certification of the System 80+ Design Docket No. 52-002, Chapters 15-22 and Appendices
This final safety evaluation report (FSER) documents the technical review of the system 80+ standard design by the U.S. Nuclear Regulatory Commission (NRC) staff. The application for the system 80 + design was initialy submitted by Combustion Engineering, Inc., now Asea Brown Boveri-Combustion Engineering (ABB-CE), in accordance with the procedures of Appendix O of part 50 of Title 10 of the Code of Federal Regulations (10 CFR part 50). Later ABB-CE requested that its application be considered as an application for design approval and subsequent design certification pursuant to 10 CFR $ 52.45. (Jml)
Judul | Edisi | Bahasa |
---|---|---|
Control Systems Safety Evaluation and Reliability | 3 | en |